SWITEK Robotic Arms for Injection Molding Machine Installation Instruction -- Chapter 6: Record Management

Injection Robotic Arm

One Stop Robotic Arms for Injection Molding Machine Purchasing

SWITEK Robotic Arms for Injection Molding Machine Installation Instruction -- Chapter 6: Record Management
Abstract

The SWITEK 3/5 axis servo robotic arm is capable of recording more than 100 programs for different mould design. Here in this chapter we'll show you how to create a new program, backup an existing program and reload the program from a USB key and how will the robotic arm react to the program etc.

6.1 Create and Load Program

On the stop status and then click the record button on the menu bar to go into the record management page. You can maintain your programs in this page. As shown below:

robot program
  • Create Program: Input a program name in the file name box and then click the new button to create a new program.
  • Copy Program: Input a program name in the file name box and then click the copy button to copy a program to a new program.
  • Load Program: Select a program and then click the load button to load a program.
  • Delete Program: Select a program and then click the delete button to delete a program. The current used program can not be deleted.
  • Export Program: Select a program and then click the export button to back up the program to an USB Key.
6.2 Program Instruct

Turn the knob to the left to go into manual status and then click the teach button on the main menu bar to open the program editor. As shown below:

robot program

Servo action, Stack action, Fixture action, Injection, Auxiliary action, Reserve action, Check action, Wait action, Series action, Periphery are included in "Instruct" button. Clicking these buttons to edit a progremm. Press "Instruct" to back to menu.

In instruct mode, after selecting the actions you want to combine with, click "Combination" and you will get a same action step which is working at the same time when Auto operation. You can also seperate a combined step into sereral steps by pressing "Break" button.

6.2.1 Servo Action

Click the Line button to go into servo action editor, you can set the X1(X2), Y1(Y2), Z, C(Posture) axis status, as shown below:

robot program

In this page, you can set X1(X2), Y1(Y2), Z axis' position, operating speed and delay time. After clicking the icon √ comes on the left, then set up the parameters of axes, select and click "Insert" button so that the corresponding settings are confirmed and inserted into the program steps.

There are two ways to set the axis position:

  1. Input the position you wanted in the editor box.
  2. Press the axis button on the keyboard to move the arm to the position you wanted and then click the set button.

6.2.2 Program Starting Point

The six steps are shown as six axes' origin position and pose

robot program

Six stpes of [Home] status above, which are default steps status in a new program, can just be edited by click "Edit" to modify the stating position, operating speed and delay time of axes, not be deleted.

6.2.3 Stack Action

Click the Stack button to go into the stact action editor, as shown below:

robot program

Select the left side of the stack to insert the program group, set the group and then click insert button in front of the stacking step. The robot will stack products as order when Auto operation.

If you want to use the Y axis to stack, you should make sure the stack is inserted before Y-axis is lowering operation.

6.2.4 Fixture Action

Click the Fixture button to go into fixture and sucker action editor, as shown below:

robot program

The controller can set four fixtures and two sucker action, clicking the button to be controlled and the indicator turns red when output.Then click on the left so that it becomes √, clicking "Insert" the action step is inserted into the front steps of the selection procedure.

After inserting fixture and sucker action, be sure to insert Check action, or the program does not test their conformation signal. If you do not acknowledge signal, you won't need the Check action. But anyway you'd better have Check action to protect machine.

6.2.5 IMM Action

Click the Injection button to go into injection action editor, as shown below:

robot program

The operation is the same as program fixture action. See 6.2.4.

6.2.6 Auxiliary Action

Click the Auxiliary button to go into periphery action editor, you can find injector, conveyor, reserve point and stack action in this editor, as shown below:

robot program

The operation is the same as program fixture action. See 6.2.4
Times: Means how long to execute the action in a cycle.
Delay: Set how many molds in Auto when outpu, maybe every other 1 or two, etc.

6.2.7 Reserve Action

Click the Reserve button to go into action editor. As shown below:

robot program

There're four reserves on the system.
Times: Means how long to execute the action in a cycle.
Delay: Set how many molds in Auto when output, maybe every other 1 or two, etc.

6.2.8 Wait Action

Click the wait button to go into wait action editor. This type of action means the program will stop before the input signal you want to wait is on. The editor is as shown below:

robot program

Just check the signal you want to wait and click the insert button to confirm your change.

6.2.9 Comment

Click the Comment button to go into Comment editor. Where you can have some comment on the program.

robot program

You can use the virture keyboard to input the information.

robot program

6.2.10 Conditions

You can also set conditions in your program:

robot program

Attention: The program must have a Comment to use the conditions.

6.2.11 Modify Program

Select the step you want to modify and then click the modify button it will open the modify dialog, as shown below:

robot program

You can modify the action configure and press OK to confirm.

6.3 Demo

The following procedure will help you to learn and practice robot programming. In the actual mold robot program, depending on your actual situation and set the servo axis position, and setting the correct sequence with the injection molding machine.

6.3.1 Command

The procedure used to pick products and feed tail, the robot stays at the top of the mold injection molding machine and waits for the mold opened signal. When injection molding machine mold opened, arms go down and pick products and the runner, then drop the runner to the crusher, put donw the product to the conveyor, which moving every mold cycle.

6.3.2 Actions

> Turn to auto-mode.
> Arms run to start point waiting for mold opened signal.
> Suck1 for product, fixture 1 for runner.
> Arms go outside injection molding machine, and enable the mold close signal.
> Release runner.
> Put down the product the conveyor and start moving for 3 seconds.
> Arms return to waiting position.

6.3.3 Program

Home   X1: 0.0   Speed: 30   Delay time: 0.00
Home   Y1: 0.0   Speed: 30   Delay time: 0.00
Home   Z: 0.0   Speed: 30   Delay time: 0.00
Home   X2: 0.0   Speed: 30   Delay time: 0.00
Home   Y2: 0.0   Speed: 30   Delay time: 0.00
Home   Vertical Posture   Delay time: 0.00

  1. Wait: Mold Opened Delay time: 0.00
  2. Y1: 850.0 Speed: 90 Delay time: 0.00
  3. X1: 400.0 Speed: 90 Delay time: 0.00
  4. Y2: 850.0 Speed: 90 Delay time: 0.00
  5. X2: 400.0 Speed: 90 Delay time: 0.00
  6. Sucker1 On Delay time: 0.00
  7. X1: 0.0 Speed: 90 Delay time: 0.35
  8. Y1: 0.0 Speed: 90 Delay time: 0.00
  9. X2: 0.0 Speed: 90 Delay time: 0.35
  10. Y2: 0.0 Speed: 90 Delay time: 0.00
  11. Sucker1 Begin-cut
  12. Lock Mold On Delay time: 0.00
  13. Horizontal posture Delay time: 0.00
  14. Z: 1000.0 Speed: 90 Delay time:0.00
  15. Y1: 800.0 Speed: 90 Delay time: 0.00
  16. Y2: 800.0 Speed: 90 Delay time: 0.00
  17. Sucker1 OFF Delay time:0.00
  18. Y1: 0.0 Speed: 90 Delay time: 0.25
  19. Y2: 0.0 Speed: 90 Delay time:0.25
  20. Conveyor On Times: 1 Action time: 3.00
  21. Z: 0.0 Speed: 90 Delay time: 0.00
  22. Vertical posture Delay time: 0.00
  23. Mold End Delay time:0.00


Hybrid Injection Molding Machine for Laboratory Consumable Petri Dish Injection Molding -- HD170LDY-B
Haida hybrid Injection Molding Machine
HD170LDY-B

HD170LDY -- HaiDa Hybrid Injection Molding Machine

No. Name Value
1 Clamping Force 1700 kN
2 Shot Weight 147 g
3 Shot Speed 200 mm/s
4 Screw Diameter 36 mm
5 Opening Stroke 440 mm
6 Space Between Tie Bars 470 x 470 mm
7 Mold Thickness (Min) 200 mm
8 Mold Thickness (Max) 520 mm
9 Pumper Motor 56 kW
10 Heating Capacity 11 kW

Injection Automation Application -- Side Entry Petri Dishs Injection Molding Automation Solution
petri dish packing solution

SIDE ENTRY PETRI DISH PACKING SOLUTION

Introduction of SWITEK Side Entry Petri Dish Packing System

The SWITEK side entry petri dish packing system is a custom made automation system for the stable production of laboratory consumable plastic petri dish with the picking robot, the petri dish assembly, stacking, packing unit etc. integrated as auniformed system for the efficient and stable production of the petri dish. The system can be custome made for a petri dish mold layout design of 2+2, 4+4, 6+6, 8+8 etc.

Functional Units of SWITEK Top Entry Petri Dish Packing System
petri dish packing solution
  • (1) -- Side Entry Robotic Arm: The picking arm of the packing system in handling the picking of the petri dish from the injection molding machine and place them on the assembly unit.
  • (2) -- Injection Mold: The core injection unit to shape the petri dish, it can be 2+2, 4+4, 6+6, 8+8 configuragion of the petri covers and bottoms.
  • (3) -- Petri Dish Assembly Unit: Have the cover and bottom of the petri dish assembled and drop it on the conveyor.
  • (4) -- Sorting Conveyor: Lined the assembled petri dish sets for stacking before packing.
  • (5) -- Stacking Station: Have the well assembled petri dishes stacked up as requested (5/10/15/20/25 sets etc.).
  • (6) -- Petri Dish Packing Unit: Have the well stacked petri dish packed and sealed with optional function of vacuume the bag.
  • (7) -- Petri Dish Transfer Robot: Catch the well sealed petri dish bag and drop it to the conveyor.
  • (8) -- Petri Dish Dropping Conveyor: Deliver the well packed petri dish.
  • (9) -- Injection Molding Machine: The injection unit of the whole syste.

Installation Dimension of SWITEK Side Entry Petri Dish Packing System
petri dish packing solution

Productivity of SWITEK Side Entry Petri Dish Packing Solutions
    Vacuumed Sleeve Packing
  • 10 Sets/Bag --Injection Cycle time: 9s
  • 20 Sets/Bag --Injection cycle: 6s
  • 25 Sets/Bag --Injection Cycle: 5.5s
    Non-vacuumed Sleeve Packing
  • 10 Sets/Bag --Injection Cycle time: 6.5s
  • 20 Sets/Bag --Injection cycle: 6s
  • 25 Sets/Bag --Injection Cycle: 5.5s

Mold Layout Design & Sleeve Size for the Petri Dish Packing System
petri dish packing solution

Mold Layout Deisgn

petri dish packing solution

Sleeve Size for Package with Vacuum Request

petri dish packing solution

Sleeve Size for Package without Vacuum Request

petri dish packing solution

Sleeve (With Mark) Size for Package with Vacuum Request

petri dish packing solution

Sleeve (With Mark) Size for Package without Vacuum Request

I think you'll have an overall understanding about the SWITEK top/side entry petri dish packing system. If you still have any other question about it or need any help in your petri dish production project, please feel free to contact SWITEK laboratory consumable plastic parts injection molding solutions team for more information.