Keywords:PETRI DISH PACKING SYSTEM, PETRI DISH INJECTION MOLDING SOLUTIONS
The delay setting of the SWITEK side entry Petri Dish packing system is to set the delay time of each action to ensure the safety but without sacrifice the efficiency of the petri dish packing system. Here in this chapter we'll introduce the meaning of the terms in the delay setting pages to help the operator of the packing system to keep it working efficiently and safely.
Delay Setting 1
| No. | Description |
|---|---|
| 1 | Position Setting 1 (Pos Set 1) 400 |
| 2 | Position Setting 2 (Pos Set 2) 401 |
| 3 | Position Setting 3 (Pos Set 3) 402 |
| 4 | Delay Setting 1 (Delay Set 1) 403 |
| 5 | Delay Setting 2 (Delay Set 2) 404 |
| 6 | Mold Open Finished Delay (Mold Open Del) 484 |
| 7 | Mold Closed Holding Delay (Mold Close Hold Del) 485 |
| 8 | Ejector Arrived the Position Delay (Ej Arr Del) 486 |
| 9 | The robot arm petri dish calmping finish delay (Arm Clamp Cmpl Del) 487 |
| 10 | Petri Dish Transfer Clampping Delay (Trans Clamp Del) 488 |
| 11 | Main Arm Petri Dish Dropping Delay (M Arm Drop Del) 489 |
| 12 | Petri Dish Assembly Position Dropping Delay (Comb Mat. Drop Del) 490 |
| 13 | Assembled Petri Dish Dropping Delay (Comb Mat Drop Del) 491 |
| 14 | Assembly Unit Opened Delay (Stack Cmpl Mat Drop Del) 492 |
| 15 | Stacked Petri Dish Dropping Finished Delay (Stack Cmpl Mat Drop Del) 493 |
| 16 | Stacked Petri Dish Picking Delay (Conv Belt Del) 494 |
| 17 | Petri Dish Clamping Arrived Delay (Clamp Mat Arr Del) 495 |
| 18 | Petri Dish Releasing Finished Delay (Mat Rel Cmp Del) 496 |
| 19 | Petri Dish Picking Position Sensor Delay (Mat Picking Delay) 589 |
| 20 | Exchange Position Clamping Delay (Exchange Delay) 590 |
| 21 | Lower Sleeve Clip Delay (L Mold Clamp Delay) 591 |
| 22 | Upper Sleeve Clip Delay (Up Mold Clamp Delay) 592 |
| 23 | Borrow Sleeve Up/Down Up Delay (Borrow Up Delay) 593 |
| 24 | Up Sleeve Clip Delay (Up Mold Clamp Delay) 592 |
| 25 | Borrow Sleeve Up/Donw Up Delay (Borrow Up Delay) 593 |
| 26 | Upper Sleeve Welding Done Delay (Weld Arr Del) 498 |
| 27 | Sleeve Cutting Cylinder Arrived Delay (Cut Mold Cyl Arr Del) 499 |
| 28 | Down Sleeve Welding Done Delay (Low Weld Del) 500 |
| 29 | Vacuum Delay (Vac Extra Delay) 596 |
| 30 | Sleeve Suction Delay (Mold Suction Delay) 597 |
| 31 | Sleeve Suction Alarm Delay (Mold Suction Alarm Delay) 598 |
| 32 | Petri Dish Picking Error Time (Picker Error T) 700 |
| 33 | Petri Dish Picking Ok Time (Picker OK T) 701 |
| 34 | Petri Dish Dropping Delay Time (Mat Drop Del) 497 |
| 35 | Finished Parts Collecting Conveyor (Conveyor) 588 |
| 36 | Auto Mode (Auto) |
| 37 | Manual Mode (Manual) |
| 38 | System Parameters (Sys Params) |
| 39 | Position Setting (Pos Set) |
| 40 | Position Interface (Pos Interface) |
| 41 | Alarm Interface |
| 42 | I/O Monitor (I/O Mon) |
Delay Setting 2
| No. | Description |
|---|---|
| 1 | Position Setting (Pos Set 1) 400 |
| 2 | Position Setting (Pos Set 2) 401 |
| 3 | Position Setting (Pos Set 3) 402 |
| 4 | Delay Setting (Delay Set 1) 403 |
| 5 | Delay Setting (Delay Set 2) 404 |
| 6 | Petri Dish Receiving Cylinder Open Time (Jig Cyl 1 Op Delay) 696 |
| 7 | Gate 1 Delay 697 |
| 8 | Gate 2 Delay 698 |
| 9 | Up Lifting Cylinder Arrived Delay (Upp M Cyl ON) 745 |
| 10 | Up Lifting Cylinder Retreat Delay (Upp M Cyl Delay) 710 |
| 11 | Mold Conveyor Belt 711 |
| 12 | Stacking Blow Delay 733 |
| 13 | Sampling Petri Dish Dropping Delay (Blanking Mate Time) 750 |
| 14 | Auto Mode (Auto) |
| 15 | Manual Mode (Manual) |
| 16 | System Parameters (Sys Params) |
| 17 | Position Setting (Pos Set) |
| 18 | Position Interface (Pos Interface) |
| 19 | Alarm interfaces |
| 20 | I/O Monitor (I/O Mon) |
REMARKS:
HD170LDY -- HaiDa Hybrid Injection Molding Machine
| No. | Name | Value |
|---|---|---|
| 1 | Clamping Force | 1700 kN |
| 2 | Shot Weight | 114 g |
| 3 | Shot Speed | 200 mm/s |
| 4 | Screw Diameter | 32 mm |
| 5 | Opening Stroke | 440 mm |
| 6 | Space Between Tie Bars | 470 x 470 mm |
| 7 | Mold Thickness (Min) | 200 mm |
| 8 | Mold Thickness (Max) | 520 mm |
| 9 | Pumper Motor | 56 kW |
| 10 | Heating Capacity | 11 kW |
The SWITEK side entry petri dish packing system is a custom made automation system for the stable production of laboratory consumable plastic petri dish with the picking robot, the petri dish assembly, stacking, packing unit etc. integrated as auniformed system for the efficient and stable production of the petri dish. The system can be custome made for a petri dish mold layout design of 2+2, 4+4, 6+6, 8+8 etc.
Mold Layout Deisgn
Sleeve Size for Package with Vacuum Request
Sleeve Size for Package without Vacuum Request
Sleeve (With Mark) Size for Package with Vacuum Request
Sleeve (With Mark) Size for Package without Vacuum Request
I think you'll have an overall understanding about the SWITEK top/side entry petri dish packing system. If you still have any other question about it or need any help in your petri dish production project, please feel free to contact SWITEK laboratory consumable plastic parts injection molding solutions team for more information.